MICROTUNNELLING CONTRACT
LOCATION:
EMERALD BEACH NSW
DESCRIPTION:
GRAVITY SEWER 105m OF 500mm
MICROTUNNELLING CONTRACT
LOCATION:
TOOWOOMBA REGIONAL COUNCIL
DESCRIPTION:
1800RCP - 64m
PIPE JACKING CONTRACT
LOCATION:
TOOWOOMBA REGIONAL COUNCIL
DESCRIPTION:
48m OF 1650RCP PIPE JACKING UNDER QR FOR TRC STORMWATER
AUGER BORING CONTRACT
LOCATION:
NEWCASTLE NSW
DESCRIPTION:
50m 400mm GTRAVITY SEWER
AUGER BORING CONTRACT
LOCATION:
TAMWORTH REGIONAL COUNCIL
DESCRIPTION:
42m 700mm CASE BORE
AUGER BORING CONTRACT
LOCATION:
HUNTLEE NSW
DESCRIPTION:
5 X CASE BORES 42m 600mm, 500mm, 400mm ( WATER MAINS)
AUGER BORING CONTRACT
LOCATION:
TOOWOOMBA REGIONAL COUNCIL
DESCRIPTION:
700mm AUGER BORE FOR A 450 DICL WATER MAIN
MICROTUNNELLING CONTRACT
LOCATION:
COFFS HARBOUR COUNCIL
DESCRIPTION:
48m of 500mm STEEL CASE FOR A 280mm GRAVITY SEWER MAIN
MICROTUNNELLING CONTRACT
LOCATION:
MACLEAN NSW
DESCRIPTION:
24m OF 1200 J SERIES JACKING PIPE INSTALLED UNDER THE PACIFIC HIGHWAY, MACLEAN. BORE IS ONE OF 8 COMPLETED. END SURVEY HAD THE BORE WITHIN 5mm OF LINE AND GRADE.
MICROTUNNELLING CONTRACT
LOCATION:
MORORO NSW
DESCRIPTION:
40m 3 cell 800mm J SERIES JACKING PIPE INSTALLED FOR GOLDING CONTRACTORS.
AUGER BORING CONTRACT
LOCATION:
MUDGEE NSW
DESCRIPTION:
750mm STORMWATER AUGER BORE COMPLETED DURING A ARTC SHUTDOWN.
MICROTUNNELLING CONTRACT
LOCATION:
NERANGBA QLD
DESCRIPTION:
130m GRAVITY SEWER BORE UITILISING OUR 500mm LASER GUIDED MICRO TUNNELLING MACHINE FOR SHADFORTH CIVIL.
MICROTUNNELLING CONTRACT
LOCATION:
GRAFTON NSW
DESCRIPTION:
40m OF 1100 J SERIES JACKING PIPE INSTALLED FOR LEDONNE CONSTRUCTIONS. PIPELINE IS PART OF THE NEW GRAFTON BRIDGE PROJECT.
MICROTUNNELLING CONTRACT
LOCATION:
CHINCHILLA QLD
DESCRIPTION:
38m OF HUMES 1800 BUTT JOINT JACKING PIPE UNDER QUEENSLAND RAIL CORRIDOR AS PART OF THE CHINCHILLA OPEN LEVEL CROSSING PROJECT.
MICROTUNNELLING CONTRACT
LOCATION:
CHINCHILLA QLD
DESCRIPTION:
OUR CUSTOM MADE MUD PROCESSING PLANT OPERATING DURING A 100m DRIVE OF 1350 HUMES BUTT JOINT JACKING PIPE AS PART OF THE OPEN LEVEL CROSSING PROJECT.
AUGER BORING CONTRACT
LOCATION:
HUNTLEE NSW
DESCRIPTION:
WATER AND RECYCLED WATER
2 X 600MM AUGER BORE 60M
2X 400MM AUGER BORE 60M
1 X 500MM AUGER BORE 30M