When precision is required and there is no room for error, URBA have a number of custom built, laser guided Microtunnelling Machines. These machines are capable of boring from 500mm – 2400mm in diameter.URBA’s machines are able to bore in a variety of ground conditions, utilising ‘vacuum extraction’ of spoil. URBA have a custom built cleaning system which enables for the cleaning of drilling fluid during the boring process.

Once in the Vacuum tank, any excess water is drained, cleaned and re-used using our mud cleaning system which is based at the top of the bore pit. All dirt remains within the Vacuum tank and is removed to a designated site. The Vacuum Tank and Generator are mounted on our Tri – Axle trailer and Prime Mover. The generator and vacuum unit are in a silenced canopy, mounted on the trailer.
​This makes the entire boring process much cleaner and environmentally friendly.

Case Study Gallery

- Completed Projects -

Concrete jacking pipes and control cabin in a launch pit on a pipe jacking site beside a road

Microtunnelling

100m of 500mm Microtunnelling for Gravity sewer in shale.
Auger cutting head at the bottom of a narrow excavation beside a steel casing pipe

Microtunnelling

3 x 1200mm Microtunnelling bores 50m in length for Storm water
Concrete jacking pipe on a blue jacking frame in a launch pit beside a control cabin

J Series Jacking Pipe

24m of 1200mm Jacking Pipe Installed For See Civil Pacific Hwy Upgrade. Bore Was Within 8mm Of Line & Grade
Jacking rig and pipe in a narrow excavation beside a hydraulic power unit

Microtunnelling

48m of 500mm Steel Case Installed For Coffs Harbour Council, new Gravity Sewer Main.
Jacking pipe and control cabin in a launch pit during a pipe jacking job

J Series Jacking Pipe

5 Cell 800 J Series Jacking Pipe Installed For See Civil at Maclean, Pacific Hwy Upgrade.
Concrete jacking pipes and a blue steel pipe in a pit covered with geotextile, with a worker beside the pipe

J Series Jacking Pipe

3 x 800 J Series Jacking pipe Installed For Golding Contractors At Mororo. Each Bore Was 40m In length & Within 10mm On Line & Grade
Blue steel pipe lowered into a shored pit while a worker climbs a ladder

Pipe Jacking

Toowoomba Regional Council 48m Of 1650RCP Pipe Jacking Under QR For TRC Stormwater.
Jacking frame and thrust rails in a pit with a pipe entry tunnel in the excavation wall

Microtunnelling

150m of 700mm Rising Main Tamworth Regional Council.
Cutter head of a microtunnelling machine being lowered by crane into a shaft at night

Microtunnelling

1800RCP – 64m Toowoomba Regional Council
Pipe jacked into a launch pit beside an excavator, with a worker in an orange shirt guiding the pipe

Dicl Pipe Jacked In & Grout Filled

4 x 900mm Case Bores. 150m In Total.